Announcing that the evacuation of three ships was successfully carried out in the operation carried out at Yalova-based Tersan Shipyard, Hareket stated that the operations were carried out by transporting two 1400, one 1600 and one 2000 ton loads with 2 × 30 axle SMPT and 2 × 36 axle SPMT-PHP equipment.
Movement recently signed an agreement with SOCAR to provide equipment supply and lifting services during the 2024 planned downtime maintenance period of STAR Refinery.