Norse Shipyard has signed an agreement to convert the offshore tug ‘Ex Foula’ into a 5000 m3 live fish carrier. The company will lead the conversion project with the Fosen Design & Solutions and Cflow teams. The conversion project of ‘Ex Foula’ will be completed in 2023.
Evolution IAS and PMS systems will be installed by Marine Control Services Inc. on the vessel, which was previously equipped with the Kongsberg system.
The ‘Ex Foula’ to be converted into a live fish carrier, was built in 2002 and was an offshore tug, operating under the Norwegian flag.